94W ELECTRONIC MAINTENANCE CHIEF NCOER EXAMPLES

  • I dedicated over 100 hours to evaluate the Soldier Radio Waveform Network Manager (SRWNM) during IOT&E.
  • By identifying over 30 problems with the Rifleman Radio that were previously unidentified by the Project Manager office, I facilitated fast-track development.
  • I successfully fielded equipment for the RESET of thermal sights, commercial off-the-shelf (COTS) radios, and all GPS systems for the 3-2 Stryker Brigade Combat Team (SBCT).
  • With 100% accountability, I executed over 3,500 work orders within a 30-day period.
  • Through the successful RESET of Brigade assets, I increased the overall Operational Readiness rate of the BDE.
  • I provided strong leadership and guidance to a company of technicians and engineers during a challenging post-deployment period, effectively integrating deployed and undeployable Soldiers.
  • I established maintenance programs for 5 battalions and over 50 STAMIS systems.
  • My leadership and influence on unit Family Readiness fostered a sense of calmness and confidence throughout my tenure as Chief.
  • I developed an original maintenance SOP that comprehensively outlined all required maintenance procedures, personal responsibilities, part reconciliation, and safety measures.
  • I served as the Senior Maintenance Advisor to the Night Vision Program Manager.
  • In the absence of key leadership positions, I fulfilled the roles of Maintenance Technician, Maintenance Manager, and CSSAMO.
  • I volunteered for deployment to a Combat Zone to expedite the urgent fielding of the Quick Reactionary Capability weapon system, significantly enhancing warfighters’ protection and saving countless lives.
  • I supervised the PMCS procedures during the early draw of equipment, which proved vital during the equipment turn-in process, saving thousands of dollars and man-hours in repairs.
  • I effectively coordinated with the Command Maintenance Management Assistance (CMMA) Team to ensure adherence to all requirements.
  • My comprehensive knowledge of maintenance requirements and strategic analysis of the mission led to the successful placement of mechanics and equipment to support the mission.
  • I played a key role in the testing and fielding of the new GCSS-Army program for 38 UICs.
  • I provided valuable advice to the Product Manager, Installation Information Infrastructure Modernization Program (PM I3MP), regarding practical maintenance issues and expectations for fielding, resulting in reduced barriers to development.
  • I demonstrated effective leadership, guidance, and vision in managing over $100,000,000 worth of critical services across the AOR.
  • I made significant contributions to service-wide efforts in fielding Net-centric IT and telecommunication systems, expansions, and modernization upgrades.
Share this article
Shareable URL
Prev Post

MOS 94S PATRIOT SYSTEM REPAIRER NCOER EXAMPLES

Next Post

94Y, IFTE OPERATOR MAINTAINER NCOER BULLETS

Read next