15D/AIRCRAFT POWERTRAIN REPAIRER NCOER EXAMPLES

  • Provided valuable assistance to 1-229 ARB by conducting unscheduled maintenance on an AH-64 rotor head, ensuring the continuous operation of the aircraft.
  • Identified and thoroughly documented damage to the AH-64 rotor head during an inspection of the upper bearing, preventing further use of the unserviceable part. This action effectively averted potential loss of equipment and protected lives.
  • Displayed exceptional leadership qualities by not only maintaining assigned aircraft but also taking on the responsibility of supervising an Army Reserve team assigned to perform maintenance tasks.
  • Diligently performed detailed and well-documented maintenance, directly contributing to the combat readiness of all seven UH-60 Blackhawk helicopters that supported operations in the Kosovo theater.
  • Created and effectively managed the powertrain benchstock, which consisted of primary, secondary, and DART kits for AH-64s, UH-60s, and CH-47s, ensuring a streamlined and efficient inventory system.
  • Made significant contributions to the effectiveness and success of various phases involving UH-60 Blackhawks and CH-47 Chinooks, showcasing expertise and proficiency in supporting these aircraft.
  • Served as the primary bench stock representative for Airframe in the 46th Aviation Support Battalion, eliminating delays caused by parts wait time and ensuring efficient maintenance operations.
  • Provided support to the 185th TAB during multiple APOD and SPOD operations, which involved handling six CH-47s and 36 UH-60s, demonstrating reliability and competence in mission execution.
  • Exhibited exceptional skill and expertise as a member of the DART team during the brigade’s DART rodeo, contributing to the overall effectiveness and success of the operation.

Powertrain Mechanic

  • Successfully prepared and executed a real-time Downed Aircraft Recovery Team operation, surpassing standard launch time and showcasing efficiency and proficiency.
  • Reassembled fourteen AH-64D helicopters within a span of seven days, even in the face of personnel and support loss. This feat demonstrated exceptional dedication and the ability to overcome challenges.
  • Completed over 500 man-hours of aircraft maintenance, both scheduled and unscheduled, including a servocylinder replacement and two engine riggings. These efforts ensured the optimal performance and safety of the aircraft.
Share this article
Shareable URL
Prev Post

15B AIRCRAFT POWERPLANT REPAIRER NCOER BULLETS

Next Post

MOS 15E, UNMANNED AIRCRAFT SYSTEMS REPAIRER

Read next